In (Lanaz project-Erbil-Iraq) Turn Key we designed according to API-650standard 4 X ...
Turn Key 6 X 2.000 m³+ 2 X 1.000 m³+2 X 200 m³ =14400m³ Storage ...
Turn Key 3 X 10.000 m³+1 X 6.000 m³+6 X 3.000 m³+1 X 2.000 m³+2 X 500 ...
Turn Key 4 X 15.000 M³+ 3 X 13.000 M³+1 X 6.000 M³+2 X 4.250 M³+ 8 ...
Turn Key 1 X 1.500 m³ + 2 X 1.000 m³ + 1 X 500 m³= 4.000 m³ Storage ...
Turn Key 3 X 7.500 m³ + 1 X 3.000 m³ + 1 X 1.000 m³ + 1 X 400 m³ 4 X 200 m³ = ...
Turn Key 6 X 4.750 m³ = 28.500 m³ Storage Tank Khurmala Refinery Storage Tank
Turn Key 1 X 25.000 m³ = 25.000 m³ Storage Tank Khurmala Refinery Storage Tank
Turn Key 1 X 25.000 m³ = 25.000 m³ Storage Tank Khurmala Refinery Storage Tank
Turn Key 8 X 500 m³ = 4.000 m³ Storage Tank Erbil Refinery 4. Phase LPG Tank
Turn Key 1 X 27.000 m³ +1 X 24.000 m³ + 1 X 10000 m³ = 61.000 m³ Storage Tank
6” Total 13.700 Mt Well-Cpf Connection Piping Line Assembly-Welding and Cathodic ...
White product manifold-pump assemblies and mechanical piping works.Black product ...
A total of 110,000 inch piping in various diameters (1”….26”) Erbil Refinery ...
29.5 Km 6'' Natural Gas Pipeline Construction WorkKelkit Natural Gas Pipeline
In this rehabilitation project, We changed 233000 meter tube(P235GH,16Mo3, 13CrMo4-5, ...
DESING, FABRICATION, ERECTION OF STEEL STRUCTURESteel structure building design: By ...